Every Feinschliff brand pack rendered against the full 50-layout catalog. 13 brands × 50 layouts = 650 slides. Click any thumbnail to open the carousel — arrow keys / on-screen buttons navigate, Esc closes.
Binance — bold Binance Yellow accent on a deep crypto-black canvas, trading-floor urgency, BinanceNova / BinancePlex stack (IBM Plex substitute), tabular numerics. Single accent does all brand voltage; trading-up green / trading-down red are semantic price-direction tokens, never decorative. Multi-theme: dark for marketing/product, light for transactional surfaces — the deck reuses the light palette ONLY for the closing footer-reset band that closes every Binance page. Flat surfaces, no shadows. Derived from getdesign.md/binance/design-md. MIT.
Catppuccin Latte is the lightest of Catppuccin's four flavors — daylight pastel theme with a soft cream surface (base `#eff1f5`) and warm body ink (`text` `#4c4f69`). Upstream palette ships under MIT at github.com/catppuccin/palette.
Catppuccin Macchiato sits between Frappé and Mocha in Catppuccin's family ramp — darker than Frappé but with more saturation than Mocha. The base canvas is `#24273a`, slightly cooler than Mocha's near-black. Upstream palette ships under MIT at github.com/catppuccin/palette.
Claude — warm cream canvas + coral accent + serif editorial register. Derived from claude/DESIGN.md (Anthropic Claude product surface). MIT.
Feinschliff. — eponymous default brand pack. Navy ramp + warm paper + single gold accent. Bauhaus register. Noto Sans. MIT.
Feinschliff Dark inverts the canonical brand: navy-900 (`#0b1a33`) becomes the canvas; warm paper (`#faf8f3`) becomes the body ink. The single gold accent shifts from `#C9A24A` to `#e4c27a` (the lighter "highlight gold") because the warmer pale gold reads more legibly on dark. The navy ramp extends one step deeper (`navy-800` = `#070f1f`) for emphasized chapter dividers.
Ferrari — Italian motoring heritage as cinematic editorial. Near-black canvas (#181818, never pure black), single sans family (FerrariSans / Inter substitute) at modest weights (display 500, body 400, button 700), Rosso Corsa #DA291C used scarcely — primary CTAs, F1 race-position highlights only. Sharp 0px corners on every CTA, card and band: rectangular precision IS the brand. Cinematic full-bleed photography is the page chrome. Display headlines carry signature negative letter-spacing (-1.6px on display-mega, scaled). Derived from getdesign.md/ferrari (luxury automotive, chiaroscuro editorial). MIT.
Gruvbox is Pavel Pertsev's retro-groove palette (2013, MIT) — warm brown surfaces and earthtone accents that read as the analog cousin to the cool blue families like Nord and Solarized. The dark variant uses `bg` (`#282828`) as the canvas; warm mustard (`#fabd2f`) is the signature accent.
Grundschule Ramspau ("primary school Ramspau") is a small Bavarian elementary school whose claim is **Die Schule im Grünen** ("the school in the green"). The brand pack ships **6 bespoke pptx layouts** that match the school's print identity, plus everything inherited from `feinschliff` — so a `/deck --brand gs-ramspau` invocation can still reach for `process-flow`, `excalidraw-diagram`, `svg-infographic`, `kpi-grid`, etc. when the brief calls for it. The bespoke layouts are *additive*, not a replacement. Total available pool: 41 inherited + 6 brand-only = **47 layouts**.
Nord is Arctic Ice Studio's 16-color arctic palette (2016, MIT) — designed for clear, minimal, north-bluish interfaces. The four-tone Polar Night ramp (`nord0`–`nord3`) supplies the dark canvas; Snow Storm (`nord4`–`nord6`) holds the light surfaces and on-dark text. Frost (`nord7`–`nord10`) is the cool blue accent family; Aurora (`nord11`–`nord15`) is the semantic-color family (red, orange, yellow, green, purple).
Solarized Dark is Ethan Schoonover's precision-engineered 16-color palette (2011, MIT). Designed around CIELAB color space for uniform perceptual luminance — text remains readable across the warm/cool axis without saturation shifts. The dark variant uses base03 (`#002b36`) as the canvas; yellow (`#b58900`) is the warm signature accent.
Spotify — Spotify Green accent on near-black canvas, pill-and-circle geometry, heavy shadows, content-first immersion. Derived from the public Spotify product surface (getdesign.md/spotify). Not an official Spotify design system. MIT.